Air-Cooled Heat Exchanger Fan Upgrade & Soda Blast Cleaning

Air-cooled heat exchanger and condenser upgrades: FRP fan retrofits saving 20–30 % fan power and dry soda blast cleaning of tube bundles to restore capacity.

Fan upgradeAluminium blades replaced by efficient FRP fans
Power savingtypically 20–30 % fan power
Paybackoften within 2 years
CleaningDry soda blast cleaning of finned tube bundles
  • Quoted to your quantity
  • Documentation on request
  • International delivery

Product Overview

Air-cooled heat exchangers and air-cooled condensers lose performance when fins foul and old fans run inefficiently. Two services restore them: an FRP fan retrofit that cuts fan power, and dry soda blast cleaning that removes deposits from the finned tubes without damaging them.

FRP fan retrofit

Replacing old aluminium blades with modern FRP fans typically saves 20–30 % of fan power while maintaining or increasing airflow, with payback often within two years.

Dry soda blast cleaning

Sodium bicarbonate is blasted dry through the fins. It removes dirt, oil and deposits without bending the fins, without water and without chemical residues, restoring the heat transfer of the bundle.

Frequently asked questions

Why soda blasting instead of water washing?

Water washing can bend fins and leave deposits that bake on. Dry soda blasting cleans deeper, leaves no water and the residue is water-soluble.

What information do you need for a quotation?

The tower make and model or cell size, photos of the nameplate and the existing part, dimensions and quantities. For new towers and upgrades: water flow, hot and cold water temperatures, wet-bulb temperature, water quality and site location.

Need a quotation for the Air-Cooled Heat Exchanger Fan Upgrade & Soda Blast Cleaning? Send us your requirements and the delivery address – we reply with a technical proposal, price and lead time. Request a quote.

Technical Specifications

Fan upgradeAluminium blades replaced by efficient FRP fans
Power savingtypically 20–30 % fan power
Paybackoften within 2 years
CleaningDry soda blast cleaning of finned tube bundles
EquipmentAir-cooled heat exchangers (ACHE) and air-cooled condensers (ACC)

Applications

  • Refinery air coolers
  • Gas compression stations
  • Power plant air-cooled condensers
  • Petrochemical plants

Features

  • 20–30 % lower fan power
  • Payback often within two years
  • Dry cleaning without water or chemicals
  • No fin damage
  • For ACHE and ACC

Request Information About This Product

Tell us your quantity and requirements — we reply within one business day.