Product category

Cooling Towers & Parts

Field-erected and packaged cooling towers, repair, thermal upgrades and replacement, plus gearboxes, fans, drive shafts, fill, drift eliminators and nozzles.

Cooling Towers & Parts

Can’t find the exact product?

Send us the specification — we source beyond the catalogue.

Send Your Requirement

Cooling tower spare parts and upgrades

Most cooling tower problems come from worn mechanical parts or fouled fill: lost thermal performance, higher fan power, vibration and drift losses. Replacing the right components restores performance at a fraction of the cost of a new tower. We supply spare parts for field-erected and packaged towers, including fill media, drift eliminators, nozzles, gearboxes, fans, drive shafts and fan stacks.

Main spare parts

PartSign it needs replacing
Fill mediaScaling, fouling, collapse – cold water temperature rising
Drift eliminatorsVisible drift, water loss, damaged blades
Spray nozzles and distributionUneven water distribution, dry fill areas
GearboxNoise, oil leaks, high vibration
Fan and hubBlade erosion, imbalance, low airflow
Drive shaft and couplingsMisalignment, worn flexible elements
Fan stack / fan cylinderCracks, poor tip clearance

Getting the right part

Send us the tower manufacturer, model or cell dimensions, and photos or nameplate data of the component. We match replacement parts or propose upgraded designs, such as low-clog fill for poor water quality or higher-efficiency fans.

Request a quote with your requirements, quantities and delivery country – we reply with prices, technical data and lead times.

Frequently asked questions

When should cooling tower fill be replaced?

Replace fill when scaling, biological fouling or physical damage reduces thermal performance, usually seen as rising cold-water temperature at the same load.

Can you supply parts for any cooling tower brand?

In most cases, yes. With the tower model or dimensions and nameplate data, we can match or upgrade fill, eliminators, nozzles and mechanical parts.

Can upgrading parts improve performance?

Yes. Modern fill, efficient fans and better drift eliminators can restore or exceed the original design performance and reduce water and energy use.

Have a product requirement?

Share your specifications and quantities. Our team will review your request and come back with sourcing options and a quotation.

New towers, services and spare parts from one source

Wesourcia works with experienced cooling tower contractors and manufacturers who design, build, repair and upgrade towers for power plants, refineries, petrochemical, steel, LNG and HVAC installations. We supply new cooling towers, repair, upgrade and replacement services and spare parts for existing towers of all major makes: gearboxes, fans, drive shafts and motors, fill media, drift eliminators and nozzles and FRP structural members and hardware.

Why upgrade instead of replace?

Many towers lose a significant part of their design capacity through fouled fill, damaged drift eliminators, worn nozzles and inefficient fans. A thermal upgrade with modern film fill, low-drift eliminators and efficient FRP fans often restores – or exceeds – the original capacity at a fraction of the cost of a new tower. When the structure is at the end of its life, a tower replacement can be planned around a short shutdown.

What we need for a quotation

For spare parts: the tower make and cell size, photos of the nameplate or the part, and dimensions. For new towers and upgrades: water flow, hot and cold water temperatures, design wet-bulb temperature, water quality and site location. Request a cooling tower quotation.

Frequently asked questions

Do you supply parts for any cooling tower make?

Yes. We supply replacement gearboxes, fans, drive shafts, fill, drift eliminators, nozzles, FRP members and hardware for crossflow and counterflow towers of all major manufacturers. Send us the tower make, cell size and photos of the existing part.

Can you build a new cooling tower in Europe, Africa or the Middle East?

Yes. Field-erected towers are designed for your site and built by experienced crews; packaged towers are delivered factory-assembled. We quote delivered and installed where required.

How long does a cooling tower replacement take?

It depends on the tower size, but well-prepared crossflow FRP tower replacements have been completed in about six weeks on site.