Cooling Tower Thermal Upgrade & CTI Performance Test

Restore or increase cooling tower capacity with new fill, drift eliminators, nozzles and fans. CTI thermal performance test before and after the upgrade.

ScopeThermal performance test, upgrade design, supply and installation
Typical measuresHigh-efficiency fill, low-drift eliminators, new nozzles, efficient fans
Test methodThermal performance test to CTI practice
ResultLower cold-water temperature or more heat load on the same tower
  • Quoted to your quantity
  • Documentation on request
  • International delivery

Product Overview

A thermal upgrade restores – and often increases – the cooling capacity of an existing tower without building a new one. It starts with a thermal performance test to measure how far the tower is from its design, followed by the selection of new heat-transfer components and fans.

Measure before you invest

A thermal performance test to CTI practice measures water flow, temperatures, wet-bulb and fan power, and calculates the real capability of the tower. This shows how much capacity can be gained and gives a baseline for the guarantee.

Typical upgrade measures

Replacing old splash fill with modern film fill where the water quality allows, installing low-drift eliminators, new spray nozzles for even distribution and higher-efficiency FRP fans.

Verified result

After the upgrade, a second test confirms the gain. Lower cold-water temperatures improve condenser vacuum in power plants and the efficiency of chillers and process coolers.

Frequently asked questions

How much capacity can an upgrade add?

It depends on the existing tower. Towers with fouled or old fill often regain their full design capacity and sometimes more. The thermal test gives a reliable estimate.

What information do you need for a quotation?

The tower make and model or cell size, photos of the nameplate and the existing part, dimensions and quantities. For new towers and upgrades: water flow, hot and cold water temperatures, wet-bulb temperature, water quality and site location.

Need a quotation for the Cooling Tower Thermal Upgrade & CTI Performance Test? Send us your requirements and the delivery address – we reply with a technical proposal, price and lead time. Request a quote.

Technical Specifications

ScopeThermal performance test, upgrade design, supply and installation
Typical measuresHigh-efficiency fill, low-drift eliminators, new nozzles, efficient fans
Test methodThermal performance test to CTI practice
ResultLower cold-water temperature or more heat load on the same tower

Applications

  • Power plant condenser cooling
  • Refinery and chemical process cooling
  • Plants increasing production
  • Towers with fouled or old fill

Features

  • Thermal performance test to CTI practice
  • Capacity gain without a new tower
  • Fill, eliminators, nozzles and fans
  • Before-and-after verification

Request Information About This Product

Tell us your quantity and requirements — we reply within one business day.

Related Products

Have a product requirement?

Share your specifications and quantities. Our team will review your request and come back with sourcing options and a quotation.